Electrical Panel & Meter Upgrades in Reseda
Most houses in Reseda went up in the 1950s, and plenty of them are still running the panel that came with the house. That panel was sized for a stove, a fridge, and a few lights. It was not sized for central air, a dryer, a pool pump, and an EV charger. When the panel is full or the service is undersized, adding one more circuit is not the answer.

What we see in Reseda
The typical Reseda house has a detached garage, and the garage is often fed from the main panel on old underground or overhead wiring. Add a freezer out there and the circuit starts tripping. We map what is already connected before moving any breakers around.
Zinsco and Federal Pacific panels show up here often. Some insurance carriers will not write a policy with one in place. Replacing one is not a parts swap. The service, the grounding, and sometimes the meter can all have to be brought up to current code.
A good number of these homes have 100-amp service that is still fine for how they are used. If the load calculation works, you do not need a 200-amp panel. We would rather tell you that than sell you a service you do not need.
When a panel upgrade is the right call
A panel is full when there is no space left for the circuit you need, or when the breakers inside it are old enough that replacements are unreliable. It is undersized when the service cannot carry the calculated load. Those are two different problems and they get two different answers.
We start with a load calculation for the house as it sits today. If the numbers hold, we find a way to add the circuit. If they do not, we scope the service: new panel, new grounding and bonding, meter can if it cannot be reused, and the mast or lateral brought up to code.
Permits and inspection in the City of Los Angeles
Reseda is in the City of Los Angeles, so the electrical permit comes from LADBS and the inspection follows the work. A panel replacement needs a permit even when the service size stays the same.
We pull the permit, meet the inspector, and close it out. If something gets flagged, we fix it and go back. That is part of the job, not an extra line on the invoice.
LADWP coordination in Reseda
LADWP supplies Reseda, and every meter or service change runs through them. LADWP disconnects the service so the panel can be changed safely, then comes back to reconnect and set the meter once the inspection passes. If the meter can or the service drop is being replaced, they are part of that too. We schedule the LADWP work as part of the project so the house is not sitting without power while someone waits on a callback.
What a panel and meter upgrade covers
- Load calculation and a written scope before any work starts
- New main panel and breakers sized to the calculated load
- Grounding and bonding brought up to current code
- New meter can or meter main if the existing one cannot be reused
- Permit through LADBS, inspection, and any corrections
- LADWP disconnect, reconnect, and meter coordination
- Old panel hauled away and the new circuits labeled
Questions we get asked in Reseda
My panel says 100 amps. Does it have to be replaced?
No. It depends on what the house is drawing. A 100-amp service can be fine for a house with gas appliances and no EV charging. We run the load calculation first and then tell you whether an upgrade is actually required.
How long will the power be off?
Plan on being without power for the working day. In most residential upgrades LADWP disconnects in the morning and reconnects once the work and inspection are done. If the reconnect cannot happen the same day, we tell you before we schedule the job so you can plan for it.
Do I need to be home during the work?
Yes, for access to the panel, the meter, and the attic or crawl space if anything has to be run. The inspector also needs access, and we set that window with you ahead of time.
Need this looked at in Reseda?
Tell us what the house or building is doing today and what you want to add. We will tell you what the service can carry before anything gets quoted.
Request an Estimate