EV Charger Installation in Reseda
A Level 2 charger is the largest continuous load most houses will ever carry. It runs at full draw for hours, usually overnight. That is why the panel and the wiring matter more here than on almost any other circuit. We look at the whole system before mounting anything on the wall.

What we see in Reseda
Detached garages are the norm, and the car is often parked between the house and the garage rather than inside it. Where the charger goes decides the wire run, and the run decides a good part of the price.
Plenty of these homes have 100-amp service. A charger can still work, but it has to be sized to the load the house is actually carrying. Sometimes that means a 32-amp charger on a 40-amp circuit instead of the biggest unit on the shelf.
Concrete driveways and finished walls change how the conduit gets routed. We plan the route before quoting it so the number does not move halfway through the job.
Panel, circuit, and charger settings
The charger gets its own dedicated circuit. The breaker and conductor are sized for a continuous load, so a charger drawing 32 amps needs a 40-amp circuit, and one drawing 40 amps needs a 50-amp circuit.
Hardwired units are configured to the amperage the service can support. We set that during commissioning. Leaving the unit at its factory maximum is how chargers end up tripping breakers at 2 a.m.
When the panel has to change first
If there is no space or no capacity, the honest answer is a panel or service upgrade before the charger goes in. We price both together so you are not paying for two separate mobilizations and two separate permits.
LADWP coordination in Reseda
We coordinate with LADWP on every EV charger project in Reseda and confirm the service and meter requirements before work starts. If the project includes a service or meter change, we arrange the disconnect and reconnect around the inspection. That coordination is part of planning the job.
What the installation includes
- Load calculation using the charger's actual amperage
- Dedicated 240-volt circuit with the correct breaker and conductor size
- Hardwired or NEMA 14-50 installation, whichever fits the equipment
- Conduit and mounting, including exterior and garage runs
- LADBS permit and inspection when a new circuit is added
- LADWP coordination and confirmation of utility requirements before installation
- Commissioning at the right amperage and a walkthrough of the charger
Questions we get asked in Reseda
Can I put a Level 2 charger on a 100-amp panel?
Often, yes, with the charger set to a lower amperage or with load management equipment. It depends on the calculated load of the house. We run the numbers before choosing a charger size.
Do you install Tesla Wall Connectors?
Yes. We also install ChargePoint Home Flex units and universal Level 2 stations. DB Electrical is a ChargePoint Home Flex certified installer.
Does the charger have to be on the garage wall?
No. It can go on an exterior wall or a pedestal if the car parks in the driveway. The location has to be reachable by the car's cable and out of direct weather damage.
Need this looked at in Reseda?
Tell us what the house or building is doing today and what you want to add. We will tell you what the service can carry before anything gets quoted.
Request an Estimate